F.F

19 November 2026

F.F Research · AI · 19 November 2026

The Compute
Debt Map

Twenty-seven ways the companies building AI compute borrow, and who uses which. Debt is only the smallest of the books.

Thesis · filings to 2026-09-30

Debt is the smallest of the books

$35.5BMicrosoft debt
$364.6BMicrosoft leases not yet started
>$800BFive hyperscalers’ 2026 capex (BIS)
≈$1.304TFive companies’ leases not yet started (calc)

Bonds: $222B by September (BIS). Our tally of priced deals to 2026-11-04: about $253.3B (calc). Shown side by side, not as a cross-check. The $1.304T adds dates from 8/31 to 9/30.

Article architecture

Seven bases → twenty-seven methods → the map

  1. 01

    Seven bases

    Debt, leases, commitments and backlog are never added together.

  2. 02

    Twenty-seven ways to borrow

    Seven families. Each method has a case and a diagram.

  3. 03

    The map by company

    Ladder, three books, pressure, loops, holders and dates.

Method · seven bases

Seven bases, never added together

Debt

Interest-bearing debt, principal or carrying amount

Lease liability

Lease liability already on the balance sheet

Lease not yet started

Signed lease that has not commenced, so it is not on the balance sheet yet

Commitment

Purchase, capacity or undrawn commitment, not owed yet

Backlog or prepayment

Owed to the company or prepaid by customers. Not debt

Guarantee cap

Guarantee or backstop, paid only if someone else fails

Equity-linked

Equity or equity-linked raise. Not debt

Chapter 01

Twenty-seven ways to borrow

From the plainest company bond to a county bond whose main purpose is tax.

  1. 1.1 Borrowing on the company’s own credit · 8
  2. 1.2 Equity raised alongside debt · 3
  3. 1.3 Rent instead of buy · 3
  4. 1.4 Borrowing against GPUs and customer contracts · 3
  5. 1.5 Borrowing through a separate project company · 6
  6. 1.6 A stronger party stands behind it · 3
  7. 1.7 Who does the lending · 1

Chapter 1 · Borrowing on the company’s own credit · 01 · Debt

Investment-grade bonds

A company sells bonds to many investors at once, pays interest on a schedule and repays at maturity.

  1. 2026-11-04
  2. Each coupon date
  3. 2028 → 2066
  1. $25B received
  1. Coupons: fixed 4.850%–6.350%; two floaters at SOFR + 35 and + 53bp
  2. Principal, repaid tranche by tranche

↑ Above the line: what the borrower receives↓ Below: what it paysArrows are schematic, not to scale.

Microsoft’s November notes. The money comes in once, coupons go out on a schedule, and the principal goes back to investors tranche by tranche until 2066, paid from the whole company’s cash flow.

Sources: S-400 · L88, L190, L193; S-401 · L21; S-143 · L2092; S-133; S-144; S-146

Chapter 1 · Borrowing on the company’s own credit · 02 · Debt

Ultra-long and century bonds

The same bonds, with maturities of 40, 50 or even 100 years.

Years from issue to final maturity

  1. Alphabet£1B at 6.125%, due 2126100 years
  2. AmazonMarch 2026 deal: a tranche due 207650 years
  3. MicrosoftLongest new tranche, 6.350%, due 206640 years
  4. A 10-year bondFor comparison10 years
All three were sold in 2026. Long money matches long-lived buildings, but the investor carries the rate risk for the whole term, which is why the coupon sits above a 10-year bond’s.

Sources: S-139 · fwp-20260210b L96, L132; S-133 · fwp-20260310 L46; S-400 · L193

Chapter 1 · Borrowing on the company’s own credit · 03 · Debt

Foreign-currency bonds

Bonds sold in other currencies, to reach investors outside the dollar market.

  1. Euro€14.5B
  2. Canadian dollarC$14B
  3. Swiss francCHF 2.8B
  4. Sterling£4.25B
BorrowerAmazon

Reaches investors who buy only their own currency, without crowding its dollar curve

  1. UsuallySwapped back into dollars

    The cost: one more currency to manage

Four markets feed one borrower. Alphabet did the same with ¥576.5B of yen bonds and deals in euros, Canadian and Australian dollars and Swiss francs.

Sources: S-140 · fwp-20260515 L91–L137; S-143 · L2094; S-133 · fwp-20260311 L168–L275; S-30 · L1039–L1160

Chapter 1 · Borrowing on the company’s own credit · 04 · Commitment

Commercial paper and revolving credit

Short-term borrowing that the company draws and repays as its cash needs change.

Credit lines, and how much was drawn

  1. AmazonCommercial paper program$0 drawn
  2. AlphabetCommercial paper program$0 drawn
  3. AnthropicSecured revolver, 2026-09Undrawn
  4. OpenAIRevolver, signed 2024Undrawn at signing

The lineDrawn: only this part is debt

Four lines, none drawn on the dates reported. A line is a lender’s promise and becomes debt only when it is drawn. Oracle, by contrast, repaid $1.1B of commercial paper in one quarter.

Sources: S-30 · L1163; S-143 · L2086; S-11 · L10478; S-60 · L21353; S-288 · L25

Chapter 1 · Borrowing on the company’s own credit · 05 · Debt

Term loans and delayed-draw term loans

A bank commits a fixed amount; the borrower draws it at once or in stages as it buys equipment.

  1. Signing
  2. Each GPU purchase
  3. Every month
  4. 2030-08-21
  1. A commitment, not cash yet: $2.6B for DDTL 3.0
  2. Draw up to 80% of that spend
  1. Interest over SOFR; prepay if the balance tops 85% of depreciated cost
  2. Final maturity

↑ Above the line: what the borrower receives↓ Below: what it paysArrows are schematic, not to scale.

A delayed-draw loan is a promise first and debt only as it is drawn. Amazon’s $17.5B unsecured term loan, signed in June 2026, was fully drawn by September. How the 85% test tightens as the GPUs age is charted under method 15.

Sources: S-403 · L1077; S-388 · L253, L365, L741; S-152 · L120

Chapter 1 · Borrowing on the company’s own credit · 06 · Debt

Bridge loans

A short loan that carries the borrower until longer-term money arrives.

  1. Day 0Borrow short

    SoftBank: a $40B bridge loan. Nebius: $3.5B from Citi, due in 364 days.

  2. Right awaySpend it

    SoftBank put the money into OpenAI’s equity round.

  3. Within the yearLong money arrives

    Bonds, new shares or an asset sale.

    On time
    LateRefinance the bridge

    The long money is late, or dearer than planned.

  4. EndRepay the bridge
A bridge buys time, so its risk is time. If the long money comes late or costs more, the bridge has to be refinanced.

Sources: S-270 · L28; S-158 · L27

Chapter 1 · Borrowing on the company’s own credit · 07 · Debt

High-yield bonds

Bonds from borrowers rated below investment grade, who pay higher interest.

  1. AAAMicrosoft
  2. AA+Alphabet
  3. AAAmazon
  4. AA-Meta
  5. A+Hyperion notesMeta’s campus joint venture
  6. A
  7. A-
  8. BBB+
  9. BBB
  10. BBB-OracleSince 2026-07-09
  11. Investment grade aboveHigh yield below
  12. BB+SoftBankDollar bonds at 8.625%–9.750%
  13. BB
  14. BB-
S&P’s scale; each borrower’s rates are in the ladder in Chapter 2. BBB- is the last investment-grade notch; one step lower, a borrower pays high-yield prices. AI companies issued 41% of this year’s new, non-refinancing US high-yield bonds (Bank of England).

Sources: S-306 · L329; S-275 · L41, L55

Chapter 1 · Borrowing on the company’s own credit · 08 · Debt

Convertible bonds

A bond the holder can exchange for shares, so the interest is low.

Illustration: what a holder gets at maturity

Value received per bond

PrincipalBelow it: the principal comes back in cashAbove it: holders convert; the value follows the shares
  1. Conversion price

Share price at maturity →

Below the conversion price the bond is just debt: the holder gets the principal back. Above it, the bond is worth the shares it converts into, and existing shareholders are diluted. CoreWeave’s $4.2B at 2.875% is due 2033.

Sources: S-51 · ex991-pricing L10; S-410 · L959; S-404 · L2786; S-60 · L22081

Chapter 1 · Equity raised alongside debt · 09 · Equity-linked

Mandatory convertible preferred

Preferred shares that pay a fixed dividend and must turn into common shares on a set date.

  1. 2026-10-29
  2. Each dividend date
  3. Set date
  1. Meta receives $12.5B
  1. Fixed 6.50% dividend
  2. Converts into common shares; nothing is repaid in cash

↑ Above the line: what the borrower receives↓ Below: what it paysArrows are schematic, not to scale.

Meta’s issue. The money comes in once, a fixed dividend goes out for a few years, and on the set date the preferred shares convert. The end is always shares, never a cash repayment.

Sources: S-145 · 8k-20261029 L120; S-147 · 424b5-final-20260204 L21; S-143 · L2688–L2694

Chapter 1 · Equity raised alongside debt · 10 · Equity-linked

At-the-market offerings and forward sales

Selling new shares bit by bit, or at a price fixed now for delivery later.

Share sales: sold, agreed and planned

  1. OracleATM program, used in one quarter$20B
  2. AlphabetATM program of $40B$12.4B sold
  3. MetaForward sale of 40M sharesabout $24.9B (calc)
  4. MetaPlanned ATM; no agreement signedabout $60B

Sold: cash receivedUnused or only planned: not cashAgreed: cash comes at settlement

Shown side by side, never added. Only the solid part is money received; the rest depends on future sales, or on Meta’s forward sale settling by 2027-11-19.

Sources: S-11 · L5555; S-141 · fwp-20260601 L51, L131; S-143 · L2714; S-145 · 8k-20261029 L140; S-04c · L44

Chapter 1 · Equity raised alongside debt · 11 · Equity-linked

Warrants as payment

The right to buy shares at a fixed, often tiny price, given in exchange for a guarantee, an order or a tenant.

Gives the warrantsGets themTermsIn return
TeraWulfGoogle73.58M shares at $0.01A backstop for its tenant’s rent
AMDOpenAIUp to 160M shares at $0.01, vesting as GPUs are deployed; none vested as of 2026-06-27A large GPU order
Applied DigitalCoreWeave—A tenant for its halls
Warrants go to whoever the issuer needs: a stronger backer, a large customer or a tenant. A dash means the terms are not in our sources.

Sources: S-170 · L1625; S-256 · L123; S-165 · L1877

Chapter 1 · Rent instead of buy · 12 · Lease liability

Finance and operating leases

Renting buildings or machines on a long contract instead of buying them.

Microsoft’s interest expense, FY27 Q1 (to 2026-09-30)

  1. Microsoft$870M in the quarterAbout 88% leases

Finance-lease interest: $769MOther interest: $101M (calc)

Rent includes interest, and at Microsoft most of the interest it pays sits inside its leases. The 88% and the $101M are our calculations.

Sources: S-103 · L534; S-100 · L841, L1815, L1923

Chapter 1 · Rent instead of buy · 13 · Lease not yet started

Leases not yet started

Leases signed for buildings not yet handed over; they are not on the balance sheet yet.

Illustration: one lease, before and after it starts

Amount shown in the accounts

Before: nothing on the balance sheet; the rent promised is only in a footnote (dashed)After: a liability, paid down by the rent
  1. Lease starts

Time →

Until the hall is handed over, the rent already promised appears only in a footnote. On the start date the lease liability enters the balance sheet in one step, then falls as rent is paid.

Sources: S-100 · L1989; S-01 · L1262; S-11 · L5460; S-403 · L891; S-105 · L1537; S-300 · p3 L76; F-407

Chapter 1 · Rent instead of buy · 14 · Lease liability

GPU sale-leasebacks and GPU finance leases

A fund buys the GPUs and leases them to the company that uses them.

Seller and tenantxAI, inside SpaceX

The GPUs stay in its halls

  1. Title to the GPUs
  2. $5.4B purchase price
  3. Rent over the term
Buyer and landlordValor Compute Infrastructure

A fund; title to the GPUs moves into its name

$3.5B of debt toward the price

LendersApollo-led

The buyer borrows too

The chips never move; only the title and the money do, and the buyer borrows much of the price itself. The full structure, guarantees included, is drawn in Sale-Leaseback.

Sources: S-204 · L46, L48; S-267 · L112; S-60 · L22955

Chapter 1 · Borrowing against GPUs and customer contracts · 15 · Debt

GPU-backed loans

Loans secured on GPUs and the customer contracts they serve.

The most the loan may be, as a share of what the GPUs cost

Draw-day limit: 80%
  1. 85%
  2. 70.8%
  3. 56.7%
  4. 42.5%
  5. 28.3%
  6. 14.2%
  7. 0

Years of straight-line depreciation

CoreWeave’s DDTL 3.0 formula, worked through (calc): the loan may not exceed 85% × (cost − six-year straight-line depreciation). The test runs monthly from three months after the commitment period ends; the chart shows one bar a year. Older chips carry less loan.

Sources: S-150 · L4586; S-162 · L24; S-404 · L2080; S-50 · L1719

Chapter 1 · Borrowing against GPUs and customer contracts · 16 · Commitment

Vendor financing, customer prepayments, bring-your-own chips

Getting hardware without paying for it up front: the vendor finances it, the customer prepays, or the customer brings its own chips.

The questionWho pays for the chips first?
  1. The vendor’s side lendsAmazon

    A secured facility of up to about $80B: draws from 2027 Q1 to 2028 Q3, five years each, floating rate, backed by the equipment bought.

  2. The customer pays aheadOracle, IREN

    Oracle received $11.4B of prepayments in Q1 FY27. IREN’s recent prepayments equal 45%–55% of GPU capex (company figure).

  3. The customer brings the chipsOracle

    In its large contracts, prepayments and customer-supplied GPUs come to $75B together.

Three ways around paying up front. Until it is drawn, Amazon’s facility is a commitment, not debt.

Sources: S-13 · L114; S-11 · L10478; S-161 · L3; S-403 · L1079

Chapter 1 · Borrowing against GPUs and customer contracts · 17 · Commitment

Take-or-pay contracts

The customer reserves capacity and pays for it whether it uses it or not.

Anthropic’s compute commitments, from its prospectus

  1. GoogleMinimumat least $114.5B
  2. AmazonMinimumat least $110B
  3. MicrosoftMinimumat least $44.9B
  4. SpaceXAICan be cancelled on 90 days’ noticeup to $120.5B

Owed whether used or notA cap that can be cancelled

Shown side by side, never added. Lenders count the firm part as cash: CoreWeave borrows against contracts like these and is tested on how much of the cash actually arrives.

Sources: S-150 · L382; S-159 · L11485; S-60 · L22831–L22865

Chapter 1 · Borrowing through a separate project company · 18 · Debt

Joint ventures and special-purpose vehicles

A campus built in a company the tech company only partly owns, so its debt stays off the tech company’s balance sheet.

On Meta’s balance sheet

Tenant, 20% ownerMeta

Signs the lease; does not consolidate the JV

  1. Rent, up to 20 years from 2029
  2. Residual value guarantee
  3. The campus

Off Meta’s balance sheet

Joint ventureHyperion (Beignet)

Blue Owl funds 80%, Meta 20%. Development cost about $27B.

$27.294B at 6.581%, due 2049

BondholdersPIMCO among them

S&P rates the notes A+, a notch below Meta

The debt sits in the right-hand box, so it is not on Meta’s balance sheet; Meta’s rent repays it. The dashed guarantee is the next method.

Sources: S-03 · L34, L48; S-200 · L3006; S-206 · L21; S-300 · p6 L259

Chapter 1 · Borrowing through a separate project company · 19 · Guarantee cap

Residual value guarantees

The tenant promises the campus will be worth an agreed amount when the lease ends, and pays the gap if it is not.

Illustration: what Meta pays when the lease ends

What Meta pays

CapWorth less: Meta pays the shortfall, up to the capWorth the agreed value or more: nothing to pay
  1. Agreed value

Campus value when the lease ends →

Meta’s guarantees on Hyperion and El Paso are capped at $41.493B in total. Because Meta judges a payment “not probable”, it books no liability; the footnote gives only the maximum.

Sources: S-01 · L1050, L1066

Chapter 1 · Borrowing through a separate project company · 20 · Debt

Construction and syndicated loans

A loan paid out in stages as the building goes up.

  1. Signing
  2. Construction
  3. 2028
  1. Up to $2.288B committed
  2. Drawn as the work is done
  1. Interest only, SOFR + 2.5%
  2. Principal due

↑ Above the line: what the borrower receives↓ Below: what it paysArrows are schematic, not to scale.

Abilene’s first two buildings, leased to Oracle for 15 years. Banks arrange loans like this and then sell pieces on: at a campus in Shackelford, Texas, banks committed $23B at about benchmark + 2.5 points and later distributed it to loan investors and private credit funds (media report citing Bloomberg).

Sources: S-208 · L347, L387; S-214 · L41, L51

Chapter 1 · Borrowing through a separate project company · 21 · Debt

Project bonds

Bonds repaid only from one campus’s rent and assets.

  1. River Bend (Hut 8)Google backs the rent6.129–6.192%
  2. HyperionTenant: Meta6.581%
  3. Polaris Forge 1 (Applied Digital)Tenants include CoreWeave; three tranches6.75–9.25%
  4. Helios (Galaxy)Tenant: CoreWeave9.875%
Coupon, or range of coupons, on each project bond. Each is repaid only from one campus’s lease and assets, so the tenant behind the rent sets the price. At Applied Digital and Galaxy the parent guarantees only that the building gets finished.

Sources: S-200 · L3006; S-183 · L10255, L10275; S-180 · L106; S-165 · L1385–L1410, L1530

Chapter 1 · Borrowing through a separate project company · 22 · Debt

Asset-backed securities (ABS and CMBS)

Many leases or loans pooled and sold as bonds paid from their combined rent.

The poolRent from many data-center leases or loans

Cash, top down

  1. SeniorPaid first
  2. MezzaninePaid next
  3. JuniorPaid last

    First to lose if the rent falls short

Losses, bottom up

How a pool pays, in general; the layers and their names vary by deal. US data-center ABS and CMBS issuance went from $9.4B in 2021 to about $26B in 2025 (preliminary). In one $1.26B single-tenant CMBS, KBRA valued the building 27.2% below the appraiser; on its value the loan is 108.4% of the building.

Sources: S-226 · p12 L509, L517, p4 L115; S-229 · L29; S-306 · L339

Chapter 1 · Borrowing through a separate project company · 23 · Debt

Industrial revenue bonds

Bonds issued in a county’s name for a private project, mainly for the tax treatment; the county does not repay them.

Buys the bondsDeveloper’s affiliate

Signed for series 2025A

Pays for the bonds; cap $165B
Issuer in name onlyDoña Ana County, New Mexico

Not liable for repayment; receives PILOT in place of property tax

Passes the proceeds on
Gets the moneyProject Jupiter

Builds the campus and pays the bonds

Bond payments go back to the developer group
Read along the arrows: the money leaves the developer group and returns to it. The county’s name is on the bonds, but it repays nothing.

Sources: S-218 · p5 L170, p6 L212, p7 L236, p8 L284–L285; S-217 · p129 L40

Chapter 1 · A stronger party stands behind it · 24 · Commitment

Capacity backstops

A large company promises to buy whatever capacity the provider cannot sell to others.

Illustration: the capacity a provider has to sell

  1. Demand strongCustomers buy most of it
  2. Demand weakThe backstop buys the rest

Sold to customersBought by the backstop, up to its order

An illustration, not company figures. Either way the capacity is paid for, up to the size of the backstop, and that is what lets the provider show lenders a contract. Nvidia’s order with CoreWeave: $6.3B, running to 2032. Meta’s with Nebius: up to $15B.

Sources: S-151 · L102; S-159 · L5520

Chapter 1 · A stronger party stands behind it · 25 · Guarantee cap

Payment backstops and guarantees

A stronger company agrees to pay, or step in, if a tenant cannot pay its rent.

  1. LeaseAnthropic rents about 401 MW for 20 years

    At TeraWulf’s Kentucky campus (Raylan)

  2. 2026-11-04Google signs credit support

    While the rent is paid, nothing moves

IfAnthropic misses rent or goes bankrupt
  1. Option 1Google pays the rent

    and takes over the lease

  2. Option 2Google pays a termination amount

    and takes equity in the project company

With Google behind the rent, the landlord can borrow against the lease; this project’s financing has not closed.

Sources: S-105 · L3028; S-254 · L75, L79; S-408 · L73–L79; S-409 · L117

Chapter 1 · A stronger party stands behind it · 26 · Commitment

Utility minimum bills and collateral

Utilities now require data centers to pay for a minimum share of the power they reserve, used or not.

AEP Ohio’s minimum bill, with two example sites

  1. Site AUses 60% of the demand it reservedBilled 85%
  2. Site BUses 95%Billed 95%

Used and billedBilled but not used

The 85% floor is AEP Ohio’s rule; the two sites are examples. A data center rated below A-/A3 must also post collateral. The grid writes its own take-or-pay.

Sources: S-341 · L84, L90

Chapter 1 · Who does the lending · 27 · Debt

Private credit and BDCs

Funds that lend directly, outside the banking system.

  1. Insurers
  2. Pensions
  3. Individuals, through BDCs

    Can ask for their money back

Lenders outside the banksPrivate credit funds and BDCs

9% of AI investment funding in 2024, 34% in 2025

  1. GPU loansBlue Owl to IREN

    $2.4B at 9%

  2. Fund debtApollo-led, to Valor

    $3.5B toward GPUs leased to xAI

  3. Pieces of bank loansBought from the arranging banks

    Construction and project loans

Long loans on one side; on the other, savers who can ask for their money back. One BDC received redemption requests for 21.9% of its shares in a quarter.

Sources: S-306 · L329; S-162 · L24; S-204 · L46; S-300 · p6 L240; S-228

Chapter 1 · Not borrowing · media report (CNBC)

Not borrowing: credit default swaps

315bpOracle 5-year CDS, 2026-10-19
>1,140bpCoreWeave 5-year CDS, intraday, 2026-10-15
15.78%Yield on CoreWeave’s 9.75% bonds due 2031, same day

A contract that pays out if a borrower defaults; a higher price means more worry. Prices, not forecasts: we do not turn them into default probabilities.

Chapter 02

The map, company by company

The same tools, sorted by who borrows: what each group uses, what it pays, and which dates come first.

  1. 2.1 The rate ladder
  2. 2.2 Three books
  3. 2.3 Interest
  4. 2.4 Off the balance sheet
  5. 2.5 Payment pressure
  6. 2.6 Tenant-priced bonds
  7. 2.7 Model labs
  8. 2.8 Loops
  9. 2.9 Holders and dates

Chapter 2 · The rate ladder

Who repays sets the rate

  1. MicrosoftAAA · 2026 notes, 10 tranches4.85–6.35%
  2. MetaAa3/AA- · 2026-04, $25B, 6 tranches4.55–6.45%
  3. SpaceX (incl. xAI)2026-06, $25B unsecured5.855%
  4. Hut 8 project (Google backstop)2042 bonds6.129–6.192%
  5. OracleBBB- · 2026-02, $25B, 8 tranches4.55–6.85%
  6. Applied Digital project3 tranches, 2030–20316.75–9.25%
  7. SoftBankBB+ · USD bonds8.625–9.75%
  8. Galaxy Helios$3.507B, 20319.875%
  9. xAI (2025, repaid)$3B secured notes12.5%
  10. CoreWeave DDTL 1.0GPU loan, effective rate15%

Coupon or rate range by borrower, low to high. Representative instruments, not averages.

Chapter 2 · Hyperscalers: three books, side by side

Three books, read across, never added

CompanyDebtLeases not yet startedCommitmentsBacklog (not debt)
Microsoft$35.481B$364.6B$194.06B$683B
Amazon$173.125B$164.922Bup to $80B—
Alphabet$125.102B$130.5B$924.4B—
Meta$80.922Babout $355.73B$454.52B—
Oracle$125.337B$288B—$664B

Lead figure per book, with its date where the source gives one. A dash means the item is not in this dataset, not that it is zero. Nothing here is added.

Chapter 2 · Interest expense

Interest is now on the income statement

  1. Alphabet9M 2026 · $2.778B×6.3
  2. Meta9M 2026 · $2.322B×3.3
  3. CoreWeaveQ3 2026 · $846M×2.7
  4. Amazon9M 2026 · $3.805B×2.4
  5. OracleFY27 Q1 · $1.428B×1.5
  6. MicrosoftFY27 Q1 · $870M—

A year earlierLatest

IMF: the five hyperscalers’ interest in Q2 2026 was close to $6B, more than double a year earlier.

Chapter 2 · Off the balance sheet: project companies

Same tenant, about 1.3–⁠1.4 points dearer off the balance sheet

Meta’s own bonds

20- and 30-year notes two weeks later: 88 and 98bp over Treasuries. Aa3 / AA-.

Hyperion JV notes

$27.294B at 6.581%, due 2049. 225bp over Treasuries. S&P A+, a notch below Meta.

Calc: 225 − 98 = 127bp; 225 − 88 = 137bp. Maturities are not identical.

Chapter 2 · Off the balance sheet: project companies

Six vehicles, one of them not comparable

VehicleInstrumentAmountRateDue
Hyperion (Meta JV)Beignet Investor senior secured notes$27.294B6.581%2049-05-30
El Paso (Meta JV)Debt financing$12.5B——
Abilene (Stargate)Construction loan, first two buildingsup to $2.288BSOFR+2.5%2028
Shackelford, TexasBank commitments$23Bbenchmark +~2.5pp—
Valor Compute InfrastructureApollo-led debt$3.5B——
Project Jupiter IRBIndustrial revenue bondscap $165B——

Off-balance vehicles in the dataset. Project Jupiter’s cap is not comparable with the others.

Chapter 2 · Payments ÷ same-period yardstick

At the bottom, interest can exceed revenue

  1. CipherQ2 2026269%Interest $67M ÷ revenue $25M. Some interest is capitalized, so cash interest is higher. Q2 revenue was all mining.
  2. CoreWeaveH1 2026168%Debt service $6.2B ÷ operating cash flow $3.7B. Principal ~$5.2B plus interest $982M.
  3. TeraWulfQ2 2026126%Interest $56M ÷ revenue $45M. Some interest is capitalized, so cash interest is higher.
  4. CoreWeaveQ3 202643%Interest $846M ÷ operating cash flow $1.975B. Deferred revenue rose $2.127B in the quarter, more than the quarter's whole operating cash flow.
  5. Alphabet9M 20262%Interest $2.778B ÷ operating cash flow $127.149B. PP&E purchases of $131.953B exceeded operating cash flow.

Payments divided by revenue or operating cash flow of the same period. The dashed line marks 100%; bars stop at 300%.

Chapter 2 · Neoclouds · CoreWeave DDTL 3.0

The first alarms are tests, not maturities

Realization test starts

At least 0.85× forecast contract cash. Result not disclosed.

Cure window closes

Unlimited equity cures end. Use not disclosed.

First coverage test

Debt-service coverage of at least 1.40×.

Final maturity

DDTL 3.0, $2.6B committed.

Two of these dates have passed without a public result. That is not a default; it means we do not know yet.

Chapter 2 · Miners turned hosts · project bonds

The tenant sets the coupon

  1. Hut 8 project (Google backstop)2042 bonds6.129–6.192%
  2. HyperionA+ · 2049 notes6.581%
  3. Applied Digital project3 tranches, 2030–20316.75–9.25%
  4. Galaxy Helios$3.507B, 20319.875%

Same building type, same structure. With Google behind the rent, about 6.1%; leased to CoreWeave, 9.875%.

Chapter 2 · Model labs: borrow little, promise a lot

Labs borrow little and promise a lot

LabOwn borrowingPromised to payWho stands behind
OpenAI$4B revolver, undrawn at signing>$300B Oracle (OpenAI’s figure); $250B Azure; $38B + $100B AWSNvidia lease guarantee, cap $105B
Anthropic$15B secured revolver; ≤ $42B of 9% converts for rent≥ $114.5B Google; ≥ $110B Amazon; ≥ $44.9B Microsoft; TPU rent ≈ $161.2BGoogle credit support for the TeraWulf lease
SpaceX (xAI)$38.006B of debt; $25B unsecured at 5.855%GPU finance lease ≈ $40B, signed, not closedValor fund owns $5.4B of its GPUs

Commitments of different kinds are not added. A total near $1.4T for OpenAI exists only as a media report.

Chapter 2 · Chip vendors as financiers, and money that goes in circles

Circular is not the same as fake

  1. Amazon ⇄ OpenAI

    $50B of equity goes in; $38B plus $100B of AWS commitments come back.

  2. Microsoft ⇄ OpenAI

    $12B funded; $10B of revenue in a single quarter, plus $250B more Azure.

  3. Nvidia → OpenAI → clouds

    $30B of equity and up to $105B of guarantees; OpenAI signs cloud contracts; the clouds buy chips. The chip-purchase leg is not disclosed.

  4. Nvidia ⇄ CoreWeave

    $2B of equity plus a $6.3B capacity backstop; CoreWeave buys GPUs. The purchase amount is not disclosed.

  5. Google / Broadcom ⇄ Anthropic

    Google is shareholder, lender, guarantor and biggest cloud. Broadcom's partners lend up to $42B that can only pay Broadcom's TPU rent.

  6. AMD → OpenAI

    Warrants only so far. None vested as of 2026-06-27.

Disclosed legs only, not proven net round-trips. IMF: 14 such deals since 2023, about $300B of equity and $650B of debt for $1.4T of promised revenue.

Chapter 2 · Who ends up holding the debt

The risk ends up in someone’s savings

04 Individuals

Through BDCs. Blue Owl’s OCIC: redemption requests for 21.9% of shares. Apollo’s ADS met about a third of requests.

03 Private credit

9% of AI investment funding in 2024, 34% in 2025 (Bank of England, citing the OECD).

02 Insurers, pensions, REITs

IBM’s 401(k) held about $34.15M of Hyperion notes. A non-traded REIT owns 63% of the borrower indirectly.

01 Banks

Arrange construction loans, then sell pieces on. Shackelford: $23B (media report).

Chapter 2 · The dates that come first

The dates that come first

DateCompanyWhatAmount
2026-02-28CoreWeaveRealization-rate test starts (≥0.85×). Result not disclosed—
2026-03-01 – 2028-08-31CoreWeaveOEM financing maturities—
2026-10-28CoreWeaveUnlimited equity-cure window closes. Result not disclosed—
2026-11-04Microsoft$25B notes close$25B
2026-11-04AlphabetBackstop for the Anthropic lease at TeraWulf signed—
2026-11-11 – 2026-12-31IREN$1.5B of GPU financing open to draw$1.5B
2027-01-01 – 2028-09-30AmazonSupplier facility draw window$80B
2027–2029OracleLease commencement window$288B
2027-07-01 – 2027-12-31IRENDell deliveries begin$6.7B
2027-10-01 – 2028-06-30TeraWulfJustified campus delivery—
2027-10-31CoreWeaveFirst DSCR test (≥1.40×)—
2027-11-19MetaForward sale settles by$24.9B

Dates that start by 2027. Later ones, out to 2126, are in the article and on the Space timeline.

What to watch

Neither predicted nor dismissed

  1. 01CoreWeave 10-Q realization, coverage, cures, the monthly GPU test
  2. 02Leases not yet started the five largest buyers, and Oracle’s commencements
  3. 03Amazon’s supplier facility draws from 2027, collateral, rate
  4. 04IREN later Horizon phases, the $1.5B GPU facility, GAAP revenue
  5. 05TeraWulf–Anthropic–Google financing, support at handover, the $19B
  6. 06Nvidia guarantees and cloud commitments after 2026-11-17
  7. 07Public stress signals rating actions, redemption limits, defaults, distressed buybacks

These signals show whether the strain is building or being absorbed. They are not a reason to buy or sell anything.